- Addition of 65,000 square feet to the campus
- 28,000 square feet of renovated space
- Construction of two additional floors to the south tower
- Construction of a new neuro-critical care unit
- Central Utility Plant
- Replacement of the existing emergency power system
- Installation of three, 2-megawatt diesel generators
- Installation of paralleling switchgear
- Installation of two, 4000-amp services
- Refeeding twelve automatic transfer switches
- Upgrades of the chiller plant
- Two Story Vertical Expansion
- 30,000 square foot addition
- New electrical distribution from the central utility plant
- Upgrade of existing fire alarm system
- Tele/data riser improvements
- Relocation of existing roof equipment
- New exterior soffit lighting
- Aircraft warning lights
- Lightning protection system
- Critical Care Unit Tower expansion and renovation
To read more about the project, which was honored with a First Place accreditation at the Associated General Contractors 2017 ACE Awards – click here.