Location: Englewood, CO
GC: JE Dunn Construction
Type: Commercial

Starting a Project?
Contact Kenny Electric.

  • Addition of 65,000 square feet to the campus
  • 28,000 square feet of renovated space
  • Construction of two additional floors to the south tower
  • Construction of a new neuro-critical care unit
  • Central Utility Plant
    • Replacement of the existing emergency power system
    • Installation of three, 2-megawatt diesel generators
    • Installation of paralleling switchgear
    • Installation of two, 4000-amp services
    • Refeeding twelve automatic transfer switches
    • Upgrades of the chiller plant
  • Two Story Vertical Expansion
    • 30,000 square foot addition
    • New electrical distribution from the central utility plant
    • Upgrade of existing fire alarm system
    • Tele/data riser improvements
    • Relocation of existing roof equipment
    • New exterior soffit lighting
    • Aircraft warning lights
    • Lightning protection system
  •  Critical Care Unit Tower expansion and renovation

To read more about the project, which was honored with a First Place accreditation at the Associated General Contractors 2017 ACE Awards – click here.