Kenny had the opportunity to upgrade several of the concession areas within Empower Field at the Mile High Stadium, most often used by the Denver Broncos. Our team was tasked with keeping the building automation systems fully function while significant demolition took place on the concessions and control wires. The function was necessary to continue monitoring the 1.8 million square foot facility.

By utilizing our previous foreman, the team was able to determine the best way to bypass certain areas to ensure continual automation services during the remodel. It was essential to factor in the sheer size of the stadium and the distance between the concession areas to remain on schedule for the project’s completion.

In addition to BAS services, our team installed new control wires and components to cabinet unit heaters and exhaust fans within the remodeled spaces.

The world-famous stadium boasts unobstructed views for 76,125 fans on five levels across a total of 1.8 million square feet.

Location: Denver, CO
GC: Siemens Technology
Owner: Denver Metropolitan Football Stadium District
Type: BAS, Commercial, Hospitality
Sq. Ft. 1.8 M

Recent Projects

  • 5555 Central

  • Genesis Alkali Expansion: A Testament to Dedication

  • Umoja Biopharma

  • HighPoint Warehouse