The Anadarko Lancaster Cryogenic Plant produces up to 300 million cubic feet of Natural Gas per day. Anadarko needed a partner with a proven track record and technical experience to complete electrical and instrumentation for the plant. included a Cryo Station with a 180’ Demethanizer tower, 90’ flare, three compressor refrigeration stations, two 12,900 HP residue compressors, and two amine gas treatment buildings.
Location: | Ft. Lupton, CO |
Owner: | Anadarko Petroleum |
Type: | Industrial |