Completed an electrical upgrade to the primary voltage for the entire Ramsey plant, consisting of a new 21.6kv main control building and switching gear, refeeding trains 2,3,4,5, and the HP stabilizer transformer primaries; 500’ of duct bank with 5-6” conduits were fed to the new Ramsey train 5 transformer; rebuilt an inlet area and slug catcher that had been relocated due to a worksite incident.

This project was honored with a Second Place accreditation at the Associated General Contractors 2017 ACE Awards.

Location: Orla, TX
Owner: Anadarko
Type: Industrial